Lift Stations - 700,000-Feddan Reclamation (Mostakbal Masr)

Construction and finishing of the lift stations and their electrical installations within the 700,000-feddan reclamation project, with El Sewedy Infrastructure.

Lift Stations - 700,000-Feddan Reclamation (Mostakbal Masr)
Lift Stations - 700,000-Feddan Reclamation (Mostakbal Masr) — 2Lift Stations - 700,000-Feddan Reclamation (Mostakbal Masr) — 3Lift Stations - 700,000-Feddan Reclamation (Mostakbal Masr) — 4Lift Stations - 700,000-Feddan Reclamation (Mostakbal Masr) — 5Lift Stations - 700,000-Feddan Reclamation (Mostakbal Masr) — 6
Infrastructure Mostakbal Masr El Sewedy Infrastructure / Hydro CSI Div 09 & 26 • Station Finishes & Electrical

Construction and finishing of the lift stations and their electrical installations within the 700,000-feddan reclamation project, with El Sewedy Infrastructure.

Within the 700,000-feddan land-reclamation project at Mostakbal Masr on the Dabaa axis, SOVARI built and finished the lift (pumping) stations and executed their electrical installations, alongside El Sewedy Infrastructure, under the supervision of Hydro Consultant.

The scope combined construction, finishing and electrical installation for the lift stations — pivotal facilities in the irrigation and land-reclamation network. This type of project requires integration between civil and electrical disciplines within a vast national site.

Official Project Details:
General Contractor: El Sewedy Infrastructure | Consultant: Hydro Consultant | Scope: construction and finishing of lift stations and the stations electrical installations.
Location
Mostakbal Masr - El Dabaa Axis
General contractor
El Sewedy Infrastructure
Consultant
Hydro Consultant
CSI division
CSI Div 09 & 26 • Station Finishes & Electrical
Service
Architectural Fit-Out, Gypsum Board & Paints
Area
Mostakbal Masr

The full pre-qualification file (classification certificate, commercial register, completion certificates) is sent to consultants and contractors on request.

More projects from our track record

Sphinx Station 4 - Mostakbal Masr
Infrastructure Mostakbal Masr CSI Div 33 • Medium/Low Voltage Infra
Mostakbal Masr National Project Mostakbal Masr Engineering

Sphinx Station 4 - Mostakbal Masr

Execution of electrical infrastructure and underground cabling works at Sphinx Station 4.

Partner: AL-SADEEQ
Full Project Card
American International School (AIS)
Fit-Out & Finishes AIS School CSI Div 09 • Paints & Gypsum Board
New Cairo Arcmed Office

American International School (AIS)

Execution of interior and exterior paints and gypsum board works at the AIS campus project.

Partner: CRC DORRA